Open with the problem you are solving, not your preferred technology. Which people will use it day to day, how often, hire laravel developer and what happens today? A vendor who knows what you are trying to achieve often proposes an alternative that costs less; someone handed only a feature list will price the list as written.
Set out the scope as short scenarios: a walk through each important path. Just as important, write down what is out of scope. An explicit exclusion list removes more disagreement later than any other single page. Mark too which parts are firm and which are still open — honest teams price those differently, and pretending everything is fixed helps nobody.
List the constraints. This means systems you must integrate with, existing databases and their quality, security and compliance rules, expected load, real estate software development supported browsers or devices and any technology you are committed to. Where a date is genuinely fixed, explain what drives it: php frameworks speed comparison a team is usually able to cut the right scope to hit it, but only if they know it exists.
Define what the word done means for each item. Acceptance criteria do not need formal language: a short list setting out the expected behaviour is sufficient. That one addition shortens the review at the end dramatically and eliminates the usual argument at handover.
Finally, state what you want in the response. Ask for symfony ecommerce framework a breakdown by feature or module, a written list of assumptions, the risks the team sees and a low number and a high number. Read a wide range as useful information rather than evasion: it normally identifies where your description is thin. At that point tighten that section and request a revised number — the second estimate is much more reliable.