Start with the business problem, not a feature list. What kind of user will use this, with what frequency, and what does the process look like without it? A vendor who grasps the purpose will suggest an alternative that costs less; someone handed only a list of screens prices your assumptions along with the work.
Describe the scope as short scenarios: who does what, and what happens next. Just as important, list what you are not building. An explicit list of exclusions prevents more friction during acceptance than the rest of the brief combined. Mark too which decisions are settled and which are still under discussion — honest teams price those differently, and concealing the open questions helps nobody.
Set out your constraints. These include existing systems the software has to talk to, the data you have and b2b ecommerce development services where it lives, compliance requirements, traffic expectations, which devices matter and infrastructure that is already decided. Where a date is genuinely fixed, say what depends on it: a good team is usually able to rearrange the plan to protect it, but not if the date is a secret.
Write down what completion means feature by feature. Acceptance criteria need not use formal language: hire php unit testing engineer a plain-language note stating the expected behaviour will do. That one addition reduces the sign-off process considerably and eliminates the usual argument at handover.
One last thing, say what you expect back. Require a breakdown by feature or module, the assumptions used, whatever the team considers risky and a low number and a high number. Treat a wide range as a signal about the brief: it normally identifies where your description is thin. Then tighten that section and request a revised number — the revised figure is much more reliable.